Newcrest update below
During the quarter, field programs, including a ground geophysical (Induced Polarisation) survey, surface
geochemical sampling, and review and processing of historic drill core and drill chip samples, were undertaken to
inform target assessment and first-pass drilling in subsequent periods. Over 30 line kilometres of new IP
data acquisition and 2,000 soil samples have been acquired to progress the project. An airborne geophysical survey
is planned to commence early in the September 2023 quarter.
They are progressing well, and it appears they will be drilling soon. id have thought they might have been a little more progress, but the lack of detail throughout is a little annoying.
- Forums
- ASX - By Stock
- GBZ
- Ann: Structural Interpretation Resolves Controls at Twin Hills
Ann: Structural Interpretation Resolves Controls at Twin Hills, page-32
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GBZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.253M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 2304620 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 3022218 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 1945000 | 0.008 |
9 | 7160052 | 0.007 |
1 | 250000 | 0.006 |
2 | 2300000 | 0.005 |
1 | 500000 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 3022218 | 5 |
0.010 | 2093334 | 3 |
0.011 | 600000 | 1 |
0.012 | 504350 | 2 |
0.013 | 1464369 | 5 |
Last trade - 16.12pm 04/10/2024 (20 minute delay) ? |
Featured News
GBZ (ASX) Chart |
Day chart unavailable