"Open question, why does anyone think for a secod , a TD announcement will equate to anything?"
IMO reaching TD is important. Regardless of what many may think, there is risk in drilling a hole (down 2 kms as in this instance)! It's certainly not the same as drilling a gold prospect down say 200 metres. Very different.
If you followed the original Alameda-1 hole you will be aware that at about 1.9kms downhole the drilling was stopped temporarily due to unanticipated high pressure. Similarly at Zapato-1 the drill string got stuck at about 1.7kms downhole. The drill operator had to re-establish a side-track hole from about 1.5kms downhole depth.
Having reached TD, and providing at that depth all zones of interest have been intercepted, the operator can then carry out tests on the particular zones of interest.
- Forums
- ASX - By Stock
- MAY
- May Chart
May Chart, page-9432
-
- There are more pages in this discussion • 3,510 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.7¢ |
Change
-0.001(3.57%) |
Mkt cap ! $90.99M |
Open | High | Low | Value | Volume |
2.9¢ | 2.9¢ | 2.7¢ | $87.74K | 3.087M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 848777 | 2.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.9¢ | 284679 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 848777 | 0.027 |
3 | 98379 | 0.026 |
8 | 3469000 | 0.025 |
7 | 2024166 | 0.024 |
8 | 1123578 | 0.023 |
Price($) | Vol. | No. |
---|---|---|
0.029 | 50000 | 1 |
0.030 | 1005727 | 5 |
0.031 | 2970310 | 2 |
0.032 | 1503548 | 6 |
0.033 | 1466600 | 4 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online