MAY 9.09% 2.4¢ melbana energy limited

Ann: Block 9 Alameda 2 Appraisal Update, page-612

  1. 59 Posts.
    lightbulb Created with Sketch. 14
    Re potentially bigger than envisioned, a quarter of that webinar was AP talking about how Unit 3 was larger than expected and that it's the main takeaway from the announcement. They expected the heavy oil (albeit hoping for lighter oil) and a horizontal frac potentially flows 3 times as much. He also stated A-3 is the main game, big pressure seen at that Marti zone. Makes sense to drill A-2 and test other zones first, because funding will still be around to drill A-3 as it's more enticing, even if A-2 failed. But it didn't fail, it gave us unexpected upside with 1A flowing unassisted, and larger unit 3.

    The last DST has already derisked the area substantially for unit 3 - I assume they will attempt to find its crest for future drilling.

    Holding tight for results of Unit 2 and 1B.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.4¢
Change
0.002(9.09%)
Mkt cap ! $80.88M
Open High Low Value Volume
2.2¢ 2.4¢ 2.2¢ $123.7K 5.384M

Buyers (Bids)

No. Vol. Price($)
4 2419592 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 3008000 13
View Market Depth
Last trade - 16.10pm 31/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.