"ROM mining cost per ton unit US$3.14 x (4.4+1)=$16.95 per ton Rom /17.9%= US$94.69"
hi Croc, that is your calculation for WKT, which is moving 100% more material than the other company whose mining cost is expected to be US$112 per tonne.
Please explain how you expect to move twice the material for less?
You only need to look at SYR who has a similar grade to WKT with a lower strip ratio and no selective mining method. There total cost is around US$500-600 per tonne of concentrate produced (mining and processing), no doubt you still think wKT can produce graphite concentrate as per the outdated 2019 DFS @ US$349 per tonne.
- Forums
- ASX - By Stock
- WKT
- Spare Capacity
Spare Capacity, page-166
-
- There are more pages in this discussion • 161 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $66.45M |
Open | High | Low | Value | Volume |
9.9¢ | 9.9¢ | 9.9¢ | $15.59K | 157.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 250 | 9.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 78107 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 28040 | 0.098 |
3 | 169905 | 0.097 |
4 | 125903 | 0.096 |
5 | 242895 | 0.095 |
1 | 100000 | 0.094 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 78107 | 2 |
0.105 | 275965 | 5 |
0.110 | 1241213 | 7 |
0.115 | 353198 | 6 |
0.120 | 477177 | 4 |
Last trade - 14.52pm 16/10/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online