MAY 4.35% 2.2¢ melbana energy limited

Ann: Trading Halt, page-41

  1. 542 Posts.
    lightbulb Created with Sketch. 221
    My prediction is that Cuba had requested A3 be cancelled and the rig be used to drill horizontal wells in A2 and start production straight away. Just because there’s no mention of flow test results in the reasoning for the halt.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.