I remember this one. The project was an old cane growing paddock covered in mill mud (black stuff left over when sugar bagasse is burnt). The fraction of the sand which met specifications was far less than 20% and even then would have required processing though an extensive flowsheet to meet buyer specs (wet attritioning, sizing, high intensity magnetic separation). Marty told everyone that it was a dig and ship ready project, which would have been discovered to be wrong the moment CRB did any due diligence. Plus the nearest viable port was over 300 km away (as the closer ports were not licenced for this and would have cost too much to bring into compliance), so logistics was a killer too. Basically a project suitable for providing kindy's with sand for their sandpits was promoted as being able to provide top quality silica sands.
- Forums
- ASX - By Stock
- TNC
- Mentalist123
Mentalist123, page-23
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TNC (ASX) to my watchlist
|
|||||
Last
4.4¢ |
Change
-0.002(4.35%) |
Mkt cap ! $38.52M |
Open | High | Low | Value | Volume |
4.6¢ | 4.8¢ | 4.3¢ | $87.21K | 1.937M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 551745 | 4.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.4¢ | 11876 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 551745 | 0.043 |
3 | 137000 | 0.042 |
1 | 350000 | 0.041 |
4 | 29000 | 0.040 |
2 | 265331 | 0.035 |
Price($) | Vol. | No. |
---|---|---|
0.044 | 11876 | 1 |
0.045 | 52269 | 1 |
0.050 | 17500 | 1 |
0.054 | 50000 | 1 |
0.055 | 120000 | 1 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
TNC (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online