WR1 2.86% 51.0¢ winsome resources limited

31 Aug WR1 Webinar, page-39

  1. 1,377 Posts.
    lightbulb Created with Sketch. 2064
    highlights from the webinar:

    • 1 rig currently on site, 1 more arriving shortly, 5 total within a couple of weeks
    • 4 rigs to be converted to ground-based / tracked rigs doing resource development around Jamar, 1 heli rig to drill new areas
    • ground crews also active on Cancet and Tilley
    • regarding research reports, CE thinks 30-50mt estimates were accurate at the time, based on publicly available info
    • however CE made a point to emphasizes the potential of gravity targets extending from Jamar to the north (which may already have been drilled to some extent)
    • snow road to TT highway will take "a few months" and be completed over coming winter (70km)
    • all-weather road to TT highway will take "6-9 months" and be completed by EOY 2024
    • once this is completed they may build second camp on-site at Adina
    • 42m cash, burn rate 2.5 - 3m with 5 rigs
    • Adina should be low strip-ratio
    • CE projects 20,000m additional drilling by EOY (I think this is an intentionally low estimate, in case there are any delays)
    • 100m x 100m current drill spacing, it depends on orebody but to achieve MRE tighter spacing likely necessary for some of main zone, as close as 50m x 50m
    • CE predicts they will "properly" engage with a strategic partner post MRE, noting they are "not short of options"
 
watchlist Created with Sketch. Add WR1 (ASX) to my watchlist
(20min delay)
Last
51.0¢
Change
-0.015(2.86%)
Mkt cap ! $112.9M
Open High Low Value Volume
52.5¢ 53.0¢ 51.0¢ $260.9K 505.2K

Buyers (Bids)

No. Vol. Price($)
4 96339 51.0¢
 

Sellers (Offers)

Price($) Vol. No.
51.5¢ 8525 3
View Market Depth
Last trade - 16.10pm 13/11/2024 (20 minute delay) ?
WR1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.