    Fair point Gvan.

    Have the permitting delays held us up? undoubtedly. However, I think we should keep in mind that the battery anode refinery in lulea is for the full 104 ktpa anode, in terms of machinery/volume capacity. I may be mistaken, but I recall Talga having a modular design to the refinery. Namely, that one part of the refinery can be built before the entirety, to give say 33% capacity sooner rather than later.

    The full capacity by 2026 refinery would still be "on target". Though, I think Talga has been waiting to submit some of the paperwork for the environmental permit of the Niska expansion so a 2-year turnaround on that is probably a realistic scenario, after which the underground mine would take more time to build.

    I do agree with the perspective of delay in general. to get to 100ktpa at present rate, I would expect 2028. I'd love to be surprised however.



 
watchlist Created with Sketch. Add TLG (ASX) to my watchlist
(20min delay)
Last
53.0¢
Change
-0.050(8.62%)
Mkt cap ! $227.3M
Open High Low Value Volume
58.0¢ 59.0¢ 52.5¢ $649.3K 1.180M

Buyers (Bids)

No. Vol. Price($)
1 19006 53.0¢
 

Sellers (Offers)

Price($) Vol. No.
54.0¢ 34000 2
View Market Depth
Last trade - 16.10pm 07/11/2024 (20 minute delay) ?
TLG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.