MAY 4.76% 2.2¢ melbana energy limited

Ann: Alameda-2 - Successful Flow Test of Lighter Oil to Surface, page-727

  1. 3,121 Posts.
    lightbulb Created with Sketch. 1038
    I wouldn't think so, I recall they stated that they perforated the better zones and due to natural fractures this should suffice
    I'm hopfull and have been all along on utilising A1 well bore, i never got a definitive answer on how it was left, so it was great to hear them thinking of reinvigorating it
    Hopfully they'll use it to either test 1B and get some more production or use it as the first lateral??
    It's got the 15k psi wellhead on it so we may have to sit the rig on anyway to get that head for A3, "if" they haven't another
    As for A3, id like to just head for the prize not worry to much about shallower testing
    Its bloody exciting eitherway right!!
    Could have two production wells within a couple of weeks
    Last edited by Kangaroos67: 04/09/23
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
0.001(4.76%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.2¢ 2.2¢ 2.1¢ $45.47K 2.160M

Buyers (Bids)

No. Vol. Price($)
2 958880 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.2¢ 2883849 11
View Market Depth
Last trade - 16.10pm 07/08/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.