Well VSR started drilling on 24.04.23
Then 3 weeks later only 15 drill holes, they only showed 4 chip trays, diagrams from 4 holes drilled at depths of at the most 45m-80m, so basically really easy to report photos and diagrams, RR1 are still drilling Phase 1 and still have another 5 days of drilling to go.
RR1 have drilled more holes (34) at deeper depths which take much longer than VSR phase 1 Drilling of only 15 holes at depths of 45m-80m
By the way RR1 has drilled 34 holes in that amount of time so more work and more samples to log and deal with, Im sure RR1 after Phase 1 drilling is over will update the market sometime in mid September.
- Forums
- ASX - By Stock
- RR1
- Ann: Multiple Thick, Stacked Pegmatites Intersected at Morrissey
Ann: Multiple Thick, Stacked Pegmatites Intersected at Morrissey, page-131
-
- There are more pages in this discussion • 140 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RR1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
0.001(7.69%) |
Mkt cap ! $10.49M |
Open | High | Low | Value | Volume |
1.3¢ | 1.4¢ | 1.2¢ | $24.30K | 1.864M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 201139 | 1.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.4¢ | 2024328 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 201139 | 0.013 |
8 | 951214 | 0.012 |
4 | 790909 | 0.011 |
7 | 1694271 | 0.010 |
5 | 1137992 | 0.009 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 2024328 | 3 |
0.015 | 828078 | 4 |
0.016 | 400000 | 2 |
0.017 | 118479 | 3 |
0.018 | 345274 | 3 |
Last trade - 15.29pm 13/09/2024 (20 minute delay) ? |
Featured News
RR1 (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online