Everyone is presuming they are going to be plugging the bottom zone before moving up the well. I thought I read that the casing is 7 inches. If it is they can test upper zones and still run production tubing to the lower zone. On a 5 inch casing they need to plug.
Anyway I do know it is in no ones interest to have this entire production infrastructure in place and for the well to be off-line for any length of time not absolutely needed to do the perforations and tests. Time is literally money with this well so I think it will all happen very fast when it does.
- Forums
- ASX - By Stock
- VIL
- cash situation
cash situation, page-6
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)