WKT 0.00% 10.5¢ walkabout resources ltd

Ann: Development Progress - Lindi Jumbo Mine, page-42

  1. 3,771 Posts.
    lightbulb Created with Sketch. 1179
    All the Motor Control Centres (MCC’s) for the plant have been shipped to site and will arrive in Tanzania in the coming days. The MCC’s are fully prefabricated and once delivered to site will be connected to the electrical circuits currently being installed.

    This is not far off from powering up. It has been mentioned before that once this is installed and wired up the pre commissioning can be done for the electrical safety and equipment controls.
 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
(20min delay)
Last
10.5¢
Change
0.000(0.00%)
Mkt cap ! $70.48M
Open High Low Value Volume
11.0¢ 11.0¢ 10.5¢ $14.68K 135.6K

Buyers (Bids)

No. Vol. Price($)
9 369686 10.5¢
 

Sellers (Offers)

Price($) Vol. No.
11.0¢ 491805 12
View Market Depth
Last trade - 16.10pm 18/07/2024 (20 minute delay) ?
WKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.