Copied from 2ic
"At the time of writing (September), we have just achieved another key milestone (what exactly? throw us bone, please) in the ore commissioning process at the Mineral Separation Plant (which actually started ~6 months ago). While this process is not complete, we are now into the phase of improving mineral recoveries and refining product specifications"
The underlined above caught my interest
Refining product to meet specifications? or refining product specifications to meet zircon / hiti produced? (at acceptable recovery rates)
Chemours (still?) charter their own vessels so unlikely to send a vessel for just 7 or 8kt to go to Altamira Mexico, will need another cargo from Iluka loaded on the same vessel to keep costs down.
Doubtful there will be another shipment this quarter.
There is 20kt + 2kt of "zircon sand" (not zic or zircon) loading around the 20th Sep, it is going on vessels doing the China run not Malaysia.
At a stretch you could make a case for that to be STA'S....a 10% increase in throughput, throw everything that is not ilmenite in one pile and they might be close.
kcf
- Forums
- ASX - By Stock
- STA
- Ann: Annual Report to Shareholders
Ann: Annual Report to Shareholders, page-22
-
- There are more pages in this discussion • 51 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online