The "schedule" you refer to was always going to be a bit fluid Lulu. The joint venture have always held the ability to do what they wanted based on what happened in the last hole. As a consequence the exploration programme has been delayed on the back of 3 dry holes and the production drilling might have started a touch early.
Nothing to lose sleep over.