Absolutely no mention of hole 8 in this report. Why is this so, maybe because of the pending drilling at Mt Lamb. A little confused why its reported like this.
DIRECTORS’ REPORT (continued) Review of Operations (continued) Frewena Project The Frewena drilling program was finalised early in the reporting period and subsequently work involving core logging, cutting and sampling was completed in late 2022, together with an internal review of the geology, alteration and available assay results, fromall the Frewena drill core. Drillholes FW220002/2A, FW220006, FW220009 and FW220010 completed within the Mount Lamb gravity and magnetic trend, all return zones of subtle anomalous polymetallic geochemistry (Cu, Fe, Co, As, Pb, P and Zn) hosted in graphitic-pyritic shales and metasediments, correlating with pyrrhotite, silicification, carbonate and magnetite IOCG-style alteration. As well as highly anomalous copper results in a number of holes, the large intercepts of anomalous copper in holes FW20009 are considered most encouraging
Add to My Watchlist
What is My Watchlist?