Ann: VEN: Operations update Odin-1 flow rates, page-5

  1. 1,815 Posts.
    lightbulb Created with Sketch. 4694
    Hi stumpytrunks,
    Thanks for this. So, we may get 15 uninterrupted, streams days of Odin-1 production at 6mmscf/d raw gas for the month of September if the planned 13day shut-in period for downstream maintenance pushes out into October. Odin-1 can deliver at higher rates than 6mmscf/d, but quite rightly Operator is managing the flowing temperatures to protect equipment.

    Below is an excerpt from VEN's November 5th, 2021, update on the Odin-1 flow test update shows the well potential.

    The well is now shut-in for a pressure build up, with a stable raw gas rate of 6.5 million cubic feet per day (MMscfd) recorded just prior to shut-in. The well was also producing 38 barrels of water per day (bwpd) (interpreted to be water from condensation) at a Flowing Well Head Pressure (FWHP) of 1823 psi. Samples have been collected and will be analysed in due course, however in-field measurements estimated the raw gas was made up of 78% hydrocarbons and 22% of inerts, which is in-line with expectations. During the flowing period, whilst optimising choke settings, a rate of 10.3 MMscfd was achieved on a 36/64” fixed choke at a FWHP of 1666psi, with 60 bwpd, demonstrating that the further potential from these
    formations is significant.


    Kind regards OldGeo.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $3.674M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
9 16630498 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 10381720 9
View Market Depth
Last trade - 16.21pm 25/07/2025 (20 minute delay) ?
MEL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.