MAY 0.00% 2.2¢ melbana energy limited

Ann: Block 9 - Early Production and Spud of Alameda-3, page-98

  1. 7,715 Posts.
    lightbulb Created with Sketch. 891
    Stabilised average flow could last for barely an hour or 2.

    How long did it take to flow 1000 barrels?

    The pressure may be lost after 48 hours. Because MAY hasn’t done an extended flow test, the pressure, and hence the flow, is a risk that remains.




 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
0.000(0.00%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.2¢ 2.3¢ 2.2¢ $23.54K 1.063M

Buyers (Bids)

No. Vol. Price($)
12 1839170 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 237903 3
View Market Depth
Last trade - 16.10pm 23/08/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.