The plan is to create a dam bund and divert the water through channeling. This means no pumping, you create a diversion that naturally drains the lake. This is the most common way to deal with surface snow melt.
However given the deposit is so large and growing to the east, any delay and the HADD won't delay the project overall. They can mine to the east where no lake is present.
- Forums
- ASX - By Stock
- PMT
- Ann: Patriot Extends Strike Length to 4.35km at the CV5 Pegmatite
Ann: Patriot Extends Strike Length to 4.35km at the CV5 Pegmatite, page-25
-
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PMT (ASX) to my watchlist
(20min delay)
|
|||||
Last
44.5¢ |
Change
-0.020(4.30%) |
Mkt cap ! $264.9M |
Open | High | Low | Value | Volume |
45.5¢ | 45.5¢ | 44.5¢ | $678.8K | 1.508M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 283330 | 44.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
45.0¢ | 6560 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 283330 | 0.445 |
10 | 53130 | 0.440 |
2 | 123000 | 0.435 |
2 | 60439 | 0.430 |
4 | 194718 | 0.425 |
Price($) | Vol. | No. |
---|---|---|
0.450 | 6560 | 1 |
0.455 | 16118 | 3 |
0.460 | 110000 | 3 |
0.465 | 124000 | 2 |
0.470 | 56769 | 2 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
PMT (ASX) Chart |