CXO 4.76% 10.0¢ core lithium ltd

Banter and general comments, page-33040

  1. 844 Posts.
    lightbulb Created with Sketch. 540
    I was hoping to find out Today.

    This is on the Port Web Site-

    East Arm Wharf

    East Arm Wharf (EAW) is a multi-user facility with 4 berths spaced along 865 metres of quay line. Berths 1 and 3 are primarily used for general cargo, containers, motor vehicles and livestock.

    Berth 2 is used for bulk ore exports and has a rail mounted dry bulk ship loader. Dry bulk imports, such as slag and gypsum, can be handled at any EAW berth. Berth 4 is primarily used for bulk liquids and has a dedicated bulk liquids transfer facility.

    The continuous length of wharf facilitates flexibility in berth allocations to visiting ships.

    Heavy lift operation can occur at EAW following consultation with Darwin Port.

    Cargo handling activities are undertaken by either of the two stevedore service providers operating at EAW, LINX Stevedoring and QUBE Ports. Cargo transfers are commonly performed by mobile harbour cranes operated by the stevedores.

    Bulk Minerals Capability

    EAW has a rail mounted bulk minerals ship loader with a maximum capacity of 2,000 tonnes per hour. Bulk minerals, such as iron ore and manganese, are transferred from rail wagons to the stockpile areas using a dedicated rail dump and conveyor systems. The minerals are transported by truck from the stockpiles to the ship loader truck dump for loading onto bulk carriers.

 
watchlist Created with Sketch. Add CXO (ASX) to my watchlist
(20min delay)
Last
10.0¢
Change
-0.005(4.76%)
Mkt cap ! $213.6M
Open High Low Value Volume
10.5¢ 10.5¢ 10.0¢ $251.3K 2.473M

Buyers (Bids)

No. Vol. Price($)
63 4398422 10.0¢
 

Sellers (Offers)

Price($) Vol. No.
10.5¢ 339785 3
View Market Depth
Last trade - 16.10pm 22/07/2024 (20 minute delay) ?
CXO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.