Now this is a bit confusing.
======================
Following the initial suite of wireline runs to gather necessary geological data to evaluate the
current hole section, a wiper trip (running in the drill pipe and drill bit to section TD to clean
the borehole) is planned to be conducted prior to fluid sampling to prepare the wellbore
appropriately for the fluid sampling operation and subsequent wireline runs.
The wireline logging program is anticipated to take 6 – 8 days to complete (depending on
logging conditions and number of fluid sampling stations) including the planned wiper trip.
=======================
Sound like they may clean up, fluid sample first and then get wireline runs.
If that is the case they might halt for oil discovery news this week, before completing of wireline logs?
- Forums
- ASX - By Stock
- IVZ
- Ann: Total Depth reached & additional zones of strong gas shows
Ann: Total Depth reached & additional zones of strong gas shows, page-130
-
- There are more pages in this discussion • 759 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.7¢ |
Change
-0.002(1.92%) |
Mkt cap ! $109.1M |
Open | High | Low | Value | Volume |
7.8¢ | 8.0¢ | 7.6¢ | $91.97K | 1.182M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 287859 | 7.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.7¢ | 7314 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 307876 | 0.076 |
4 | 134282 | 0.075 |
3 | 277202 | 0.074 |
5 | 425000 | 0.073 |
1 | 27000 | 0.072 |
Price($) | Vol. | No. |
---|---|---|
0.077 | 94254 | 3 |
0.078 | 89897 | 2 |
0.079 | 242433 | 1 |
0.080 | 47037 | 3 |
0.081 | 343873 | 1 |
Last trade - 15.00pm 24/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
Previous Video
Next Video
SPONSORED BY The Market Online