ANS 0.00% 1.7¢ austsino resources group limited

CCCM – Signing of Construction Engineering Design Contract (Mining), page-2

  1. 98 Posts.
    lightbulb Created with Sketch. 8
    “The purpose of this agreement is to enlist CINF to undertake the *preliminary* design and construction drawings of the Mining Project across all of the mine sites”

    -Preliminary design and construction
    -Laying first stone Q4

    doesn’t add up. Thanks, guess I’ll go to sleep for another year.
 
watchlist Created with Sketch. Add ANS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.