Not to mention the time it will take to lay the tracks (plus bridges and tunnels) to get to Mbalam.
I don't recall the timeline on that, but a year or two?
- Forums
- ASX - By Stock
- ANS
- CCCM – Signing of Construction Engineering Design Contract (Mining)
CCCM – Signing of Construction Engineering Design Contract (Mining), page-6
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries