"I was under the impression that this process, once initiated can take merely 24 hours"
-TLC operations are slow.
- Take time for a bit trip and add in a few extra hours for slower pipe speed while tripping with wireline cable attached to the tool. 10- 12 hours normal two way trip time plus extra
- Add in logging time. Again take normal time you'd take to run the tool on wireline and add on a whole lot of extra time to allow for the fact you're tripping pipe every time you move the tool.
If they've already acquired pressures then a sampling only (say 12 stations) run on TLC would take a minimum of 1-1/2 days...more likely 2 days.
If the have to acquire pressures then add on more time for that.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 fluid sampling progress update
Ann: Mukuyu-2 fluid sampling progress update, page-168
-
-
- There are more pages in this discussion • 2,157 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.5¢ |
Change
0.001(1.35%) |
Mkt cap ! $113.7M |
Open | High | Low | Value | Volume |
7.6¢ | 7.6¢ | 7.5¢ | $16.45K | 218.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 119339 | 7.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.5¢ | 7875 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 119339 | 0.074 |
2 | 120000 | 0.073 |
3 | 84432 | 0.072 |
4 | 119050 | 0.071 |
6 | 719580 | 0.070 |
Price($) | Vol. | No. |
---|---|---|
0.075 | 7875 | 1 |
0.076 | 200000 | 5 |
0.077 | 41600 | 3 |
0.078 | 215267 | 2 |
0.080 | 94368 | 4 |
Last trade - 10.55am 04/10/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |