BRU 0.00% 8.5¢ buru energy limited

Ann: Rafael Appraisal Drilling Program Update, page-9

  1. 323 Posts.
    lightbulb Created with Sketch. 150
    ‘part of long lead item package to support the drilling of an appraisal well, and the recompletion and test of the Rafael 1 well, planned for the Kimberley field operating season in the second half of 2024’..

    So from this sentence do we assume they’re now only looking to drill one appraisal well and conduct a Re-test, rather than multiple wells?
 
watchlist Created with Sketch. Add BRU (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.