"So I guess slb get a bit of a pass as the damage to the probe was caused by the borehole which was caused by having to increase the mud weight."
Damage to Saturn probe and other tool components mainly during trip in the hole on drill pipe. As SM mentioned unlike on wireline where the tool has a certain amount of flex on drill pipe the tool is more rigid and there is a higher risk of damage when you run into hole bridges and wash outs. The 12 degree hole angle wouldnt have helped with the tool tending to run low side in the hole. A vertical hole will reduce risk of hang ups...especially if they meed to to go TLC again.
SM also mentioned a world wide shortage of MDT tools.
Mud weight will be high enough to maintain well control in the section above the overpressured Lower Angwa section.
- Forums
- ASX - By Stock
- IVZ
- Ann: Hydrocarbon gas recovered & evaluation program forward plan
Ann: Hydrocarbon gas recovered & evaluation program forward plan, page-330
-
-
- There are more pages in this discussion • 1,335 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $104.6M |
Open | High | Low | Value | Volume |
6.9¢ | 6.9¢ | 6.8¢ | $51.39K | 753.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 135503 | 6.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 61754 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 135503 | 0.068 |
7 | 421006 | 0.067 |
5 | 314807 | 0.066 |
6 | 589319 | 0.065 |
4 | 488350 | 0.064 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 61754 | 2 |
0.070 | 407194 | 4 |
0.071 | 1064037 | 10 |
0.072 | 1002000 | 8 |
0.073 | 1058106 | 6 |
Last trade - 14.40pm 17/09/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |