For each logging run The Engineer will calculate the amount of pull on the cable that will part the cable weak point. Weight of tool, weight of the cable and type of weak point are taken into account in this calculation. A safety factor is then plugged in to give a Maximum Safe Pull (MSP). Usually an Engineer is only allowed to pull over 50% of MSP with a dispensation from his supervisor in town.
Leaving a tool on a station when there are indications of differential sticking...usually a sensible operator will risk assess the situation and take into account recommendations from SLB but in the end they can usually make the call to stay on the station knowing that if they end up with the tool lost in the hole they'll be paying for it.
It would be rare for an operator to intentionally leave the tool on station knowing there was a high chance of a fishing job.
- Forums
- ASX - By Stock
- IVZ
- Ann: Hydrocarbon gas recovered & evaluation program forward plan
Ann: Hydrocarbon gas recovered & evaluation program forward plan, page-1056
-
-
- There are more pages in this discussion • 609 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.7¢ |
Change
-0.001(1.47%) |
Mkt cap ! $103.1M |
Open | High | Low | Value | Volume |
6.8¢ | 6.8¢ | 6.7¢ | $28.73K | 427.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 485500 | 6.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.7¢ | 79770 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 87754 | 0.068 |
2 | 194997 | 0.067 |
4 | 400461 | 0.066 |
6 | 709935 | 0.065 |
3 | 532500 | 0.064 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 150000 | 1 |
0.072 | 405000 | 2 |
0.073 | 370281 | 3 |
0.074 | 453798 | 2 |
0.075 | 1381014 | 2 |
Last trade - 10.17am 04/11/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |