What does the shutdown at the Landau geothermal power plant mean for Vulcan?
https://www.swr.de/swraktuell/rheinland-pfalz/ludwigshafen/geothermiekraftwerk-landau-steht-still-vor-einweihung-der-lithium-versuchsanlage-100.html
"The plant was designed in such a way that it can be operated flexibly."
"If the geothermal power plant in Landau is not in operation, there are two options."
"Either the natural pressure occurring in Landau and associated with "lower flow rates" would be used."
"Or the so-called brine will be transported by truck from the company's own geothermal power plant in nearby Insheim (Südliche Weinstraße district) to Landau."
"This could then be used to operate the test facility for lithium extraction, says the company Vulcan Energy."
- Forums
- ASX - By Stock
- VUL
- German impacts
German impacts, page-908
-
-
- There are more pages in this discussion • 102 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VUL (ASX) to my watchlist
|
|||||
Last
$4.00 |
Change
-0.110(2.68%) |
Mkt cap ! $752.7M |
Open | High | Low | Value | Volume |
$4.09 | $4.10 | $3.82 | $3.844M | 975.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1 | $3.98 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.02 | 1594 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 290 | 3.880 |
1 | 991 | 3.870 |
3 | 4000 | 3.850 |
2 | 712 | 3.840 |
1 | 4951 | 3.830 |
Price($) | Vol. | No. |
---|---|---|
4.050 | 2635 | 2 |
4.060 | 7423 | 1 |
4.080 | 4964 | 2 |
4.090 | 3855 | 1 |
4.100 | 3251 | 4 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
VUL (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online