All understood. I would have thought that they would be able to correlate the depth of the sidetrack versus the original hole based upon distance travelled and angle from the beginning of the plug. Obviously there is too many variables too accurately do this.
The less trips in and out of the hole seems quite important at this point of the drill.
Keep calm and carry on drilling as they say.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 sidetrack drilling successfully commenced
Ann: Mukuyu-2 sidetrack drilling successfully commenced, page-116
-
- There are more pages in this discussion • 103 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
6.8¢ |
Change
0.001(1.49%) |
Mkt cap ! $96.41M |
Open | High | Low | Value | Volume |
6.7¢ | 6.9¢ | 6.7¢ | $34.82K | 512.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 150899 | 6.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 131225 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 150899 | 0.068 |
1 | 150000 | 0.067 |
6 | 376496 | 0.066 |
5 | 893384 | 0.065 |
1 | 100999 | 0.064 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 131225 | 1 |
0.070 | 494994 | 5 |
0.071 | 370417 | 2 |
0.072 | 550000 | 2 |
0.073 | 460000 | 3 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |