MAY 4.35% 2.2¢ melbana energy limited

Ann: Block 9 Status of Alameda 3 and Operational Update, page-4

  1. 6,764 Posts.
    lightbulb Created with Sketch. 1643
    So the well will be drilling until March 2024 all going well.

    Chances of yet another CR.
    These guys.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.