Agree
right here in this circle
Highlighted 15-25g.m
Thats why they stopped at stage 1
Stage 1
20,500t of ore for 840oz of gold = 0.041 oz of Gold/t
0.041oz/t x 28.3495g = 1.16g/t
That pour of was low grade 1.16g/t
2nd Gold Pour off
40,000t
2671oz- 840oz from 1st mill 20500t of ore = 1831oz of Gold from 40,000t of ore
40,000t of ore for 1831oz of Gold = 0.046oz/t of Gold
0.046oz/t x 28.35g = 1.3g/t of Gold
Low Grade again
- Forums
- ASX - By Stock
- GSR
- Ann: Coolgardie Mining Centre Strategic Update
Ann: Coolgardie Mining Centre Strategic Update, page-51
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)