IVZ 1.49% 6.8¢ invictus energy ltd

Ann: Trading Halt, page-144

  1. 10,189 Posts.
    lightbulb Created with Sketch. 1986
    They would have drilled Half of the final 400m and gotten a 3200m depth and began to get some of that increased over spill pressure from Lower Angwa and they decided to halt and test before going lower. Scott specifically stated in his interview they will not be taking any chances on that pressure.

    Hence the intermediate testing call the discovery and go and test the remaining lower Angwa and then increase the net pay
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.