RR1 ann out --- HASE 2 DRILLING INCREASES SCALE OF MORRISSEY HILL LITHIUM PROJECT, YINNETHARRA, W.A.
HIGHLIGHTS
● Phase 2 Drilling has significantly elevated the scale of lithium potential at Morrissey Hill with
drilling confirming the presence of multiple, thick, stacked pegmatites1 within a previously unrecognised package of the Leake Springs Metamorphics, at Morrissey Hill South.
A total of 57 holes for 5,282m of RC drilling has been completed to date during Phase 2 drilling, with all samples already sent to the laboratory for analysis.
- Forums
- ASX - Day Trading
- Day trading pre-market open December 15
Day trading pre-market open December 15, page-34
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online