Project: Yellow Rose Well: Frances Dilworth No. 7H Working Interest: 75% Location: McMullen County, Texas Operator: San Isidro Development Company (25%) Antares advises it has successfully set an openhole whipstock at approximately 10,000 ft and has commenced horizontal drilling operations on the Frances Dilworth No. 7H. The well is currently at a measured depth of 11,776 ft where high gas readings are being encountered within the Eagle Ford shale. A pilot hole was drilled on the Frances Dilworth No. 7H where the Eagle Ford shale was found to be 161 feet thick, with porosities exceeding 15% and resistivities in excess of 100 ohms. Thirty rotary sidewall cores were also obtained and are currently undergoing geologic analysis.
AZZ Price at posting:
43.0¢ Sentiment: None Disclosure: Held