MAY 4.35% 2.2¢ melbana energy limited

Ann: Block 9 Commencement of Alameda-3 drilling, page-14

  1. 2,499 Posts.
    lightbulb Created with Sketch. 711
    Development planning underway

    Work is continuing to determine the optimal way to bring the Amistad reservoir into production, including engineering reviews of existing and required infrastructure, oil valuation and commercialisation pathway studies and discussions with potential oil off takers.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.3¢ 2.4¢ 2.2¢ $40.21K 1.760M

Buyers (Bids)

No. Vol. Price($)
18 5561359 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 3575852 17
View Market Depth
Last trade - 16.10pm 30/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.