I believe the original plan would have been to plug back the 6" hole if it had been drilled immediately after running the 7"casing, which would have probably happened if a sidetrack was not forced upon them. However, as the drilling of the 6" hole has been deferred until when the well testing equipment is on location, it now gives them the opportunity to perform a barefoot test on the 6"hole. I would hope they ran a 4-1/2" uncemented slotted liner into the 6"hole to hopefully preserve it for possible follow-up production.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 evaluation update & preparing for flow test
Ann: Mukuyu-2 evaluation update & preparing for flow test, page-53
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.1¢ |
Change
0.008(11.0%) |
Mkt cap ! $114.8M |
Open | High | Low | Value | Volume |
7.3¢ | 8.2¢ | 7.2¢ | $413.1K | 5.307M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 20000 | 8.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.1¢ | 122052 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 20000 | 0.080 |
3 | 30643 | 0.079 |
2 | 256154 | 0.078 |
4 | 165558 | 0.077 |
2 | 157500 | 0.076 |
Price($) | Vol. | No. |
---|---|---|
0.081 | 122052 | 1 |
0.083 | 409000 | 2 |
0.084 | 280000 | 1 |
0.085 | 3900 | 1 |
0.086 | 60722 | 1 |
Last trade - 16.10pm 22/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |