My understanding is that the power boxes don't meet Australian Standards. The standards are based around the specifications for the boiler chamber units themselves. As these would be an integral part of the unit I would have thought that they needed to be re-fabricated to the new standards required. As such I very much doubt that altering the existing units would be cheaper.
- Forums
- ASX - By Stock
- VPR
- guess that that is it then
guess that that is it then, page-15
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
BOE
Uranium prices on the NYMEX are stable, but ASX uranium stocks are sinking on Friday. The answer lies in Kazakhstan
DVP
Commodity house Trafigura funds Develop Global's copper-zinc Woodlawn play with offtake deal in place
Add VPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.71M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $400 | 400K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
49 | 98914549 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 73408123 | 35 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
49 | 98914549 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 73408123 | 35 |
0.003 | 31586339 | 27 |
0.004 | 32550341 | 19 |
0.005 | 23323846 | 7 |
0.006 | 33329999 | 5 |
Last trade - 10.59am 08/08/2024 (20 minute delay) ? |
Featured News
VPR (ASX) Chart |