ERM Is worth considering, with drill results due end Dec early Jan, from the High-Grade Golden Forty Project in Tennant Creek. Also waiting for the TCMG processing plant. Currently sitting in over sold territory and has floored at 5.5cps Low SOI COH $4.9 mil
Golden Forty Project The 2022 drilling intersected very significant and high-grade zones including: o 28m at 28.3 g/t gold from 141m (GFRC063) including: ▪ 9m at 84.6 g/t gold from 145m o 15m at 8.4g/t gold from 103m (GFDD059) o 6m at 41.2 g/t gold from 120m (GFRC060) o 13m at 4.1 g/t gold from 87m (within 35m @ 1.8g/t Au from 69m in GFRC058) o 6m at 5.4g/t gold from 155m (GFRC066) o 3m at 8.0 g/t gold from 132m (GFRC061) o 4m @ 6.8 g/t gold from 140m (within 21m @ 1.9 g/t Au in GFRC065)