Hi Spid, from ChatGPT:
"The term "wet commissioning" doesn't necessarily imply the use of wet materials in the sense of moisture or liquid. Instead, the term "wet" is often used metaphorically in engineering and industrial contexts to signify the actual operation of a system with real, live materials as opposed to dry runs or simulations.In the case of mining or industrial processes, "wet commissioning" means that the equipment and systems are tested and operated using the actual materials they are designed to process. This could include ores, minerals, or any other substance that the facility is intended to handle. The term is a way to emphasize the transition from the theoretical or dry testing phase to the practical, real-world operation of the system.So, in the context of mining, "wet commissioning" is about bringing the system to life with the actual materials it will handle, and it doesn't necessarily imply the presence of liquid or moisture. The term is more about the authenticity and real-world conditions of the commissioning process."
- Forums
- ASX - By Stock
- WKT
- Ann: First ore feed at the Lindi Jumbo Graphite Mine
Ann: First ore feed at the Lindi Jumbo Graphite Mine, page-7
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $66.45M |
Open | High | Low | Value | Volume |
9.9¢ | 9.9¢ | 9.9¢ | $15.51K | 156.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 93243 | 9.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 78153 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 93243 | 0.099 |
1 | 28040 | 0.098 |
4 | 187633 | 0.097 |
3 | 73820 | 0.096 |
5 | 242895 | 0.095 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 78153 | 3 |
0.105 | 275965 | 5 |
0.110 | 1241213 | 7 |
0.115 | 353198 | 6 |
0.120 | 477177 | 4 |
Last trade - 10.20am 16/10/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online