Here the short version:
- The current rate of 20 TJ/d is the daily minimum obligation from the initial GSA with Santos WA.
- Walyering wells are fully brought to production and the facility can deliver at least a rate of 33 TJ/d.
- The new GSA with Alinta Energy will increase our daily production by about 9-10 TJ/d starting from Feb.
- Current daily production of 20 TJ is due to the optimization of the Walyering gas sales value.
- Production capacity of the facility can be expanded above 33 TJ/d.
ok? (love your comments)
- Forums
- ASX - By Stock
- STX
- Ann: Walyering Production Update
Ann: Walyering Production Update, page-95
-
- There are more pages in this discussion • 92 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
|
|||||
Last
20.0¢ |
Change
0.005(2.56%) |
Mkt cap ! $572.1M |
Open | High | Low | Value | Volume |
19.5¢ | 20.0¢ | 19.0¢ | $1.339M | 6.792M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
23 | 674181 | 19.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.0¢ | 741329 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
23 | 674181 | 0.195 |
61 | 2835519 | 0.190 |
21 | 1129025 | 0.185 |
27 | 1147733 | 0.180 |
8 | 164258 | 0.175 |
Price($) | Vol. | No. |
---|---|---|
0.200 | 738218 | 5 |
0.205 | 1023792 | 5 |
0.210 | 3926440 | 15 |
0.215 | 944882 | 13 |
0.220 | 1241001 | 18 |
Last trade - 16.10pm 26/07/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |