RR1 waiting results - A total of 57 holes for 5,282m of RC drilling has been completed to date during Phase 2 drilling.
● The majority of all holes drilled across Phase 2, have reported multiple thick, stacked
pegmatites1 within favourable metasedimentary and lesser mafic volcanic rock types
● Results from this part of the Phase 2 Drilling campaign are expected to be received in early
2024, with all samples already sent to the laboratory for analysis.
- Forums
- ASX - Day Trading
- Morning Trading January 8
Morning Trading January 8, page-20
-
- There are more pages in this discussion • 306 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online