AVL australian vanadium limited

Ann: Horizon Power Vanadium Flow Battery Arrives in WA, page-8

  1. 20,814 Posts.
    lightbulb Created with Sketch. 4533
    I womder which ‘industry participants’  are lined up to see the FAT?
    And how long it will take for if any real interest will fatten the share price ?
    .. And how  long the testing will take?

    It would be excellent if new orders are booked before the pilot is installed on site in Kununurra  : )


    .. “During this process, (testing) VSUN Energy plans to host industry participants for a firsthand view of the battery’s capabilities.
    The FAT, conducted in collaboration with Horizon Power, will showcase various use cases and functionalities..

    https://www.australianmanufacturing...ival-of-horizon-powers-vanadium-flow-battery/

    AVL celebrates arrival of Horizon Power’s vanadium flow battery

    By Kate B.
    -January 8, 2024




    Vanadium Flow Battery at Fremantle Port. Image credit: Australian Vanadium Limited



    Australian Vanadium Limited (AVL) announced a significant development in its ‘pit to battery’ strategy, with the arrival of the vanadium flow battery (VFB) for the Horizon Power project in Western Australia.


    AVL’s subsidiary, VSUN Energy, is undertaking this project, aiming to support Western Australian utility Horizon Power in its efforts towards decarbonisation and enhancing grid energy storage, the company said in a news release.

    Graham Arvidson, CEO of AVL, expressed enthusiasm about reaching this crucial milestone in their strategic plan.
    Arvidson highlighted the collaborative effort with Horizon Power and the potential for high local content when combined with AVL’s locally manufactured vanadium electrolyte.
    “We are looking forward to working with Horizon Power to successfully deliver this project, allowing the utility to benefit from the role that VFBs can play in enabling decarbonisation and providing reliable, low cost, long duration grid energy storage, with the potential for high levels of local content when coupled with AVL’s WA-made vanadium electrolyte,” the CEO explained.
    The VFB, a product of global leader Invinity Energy Systems plc, has arrived in Fremantle, Western Australia, and is set to undergo factory acceptance testing (FAT) at AVL’s vanadium electrolyte manufacturing facility.


    In July 2023, Horizon Power entered into a contract with VSUN Energy for the purchase of its inaugural VFB. The 220kWh battery, capable of delivering up to 78kW of power, will undergo FAT in early 2024.
    During this process, VSUN Energy plans to host industry participants for a firsthand view of the battery’s capabilities.
    The FAT, conducted in collaboration with Horizon Power, will showcase various use cases and functionalities.
    Following the successful completion of FAT and the reception of final project components, the VFB will be deployed to Kununurra, northern Western Australia.
    VSUN Energy will oversee the installation and commissioning of the battery at the designated site, contributing to Horizon Power’s long-duration energy storage pilot.
    Last edited by sabine: 08/01/24
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
0.8¢
Change
-0.001(11.1%)
Mkt cap ! $69.07M
Open High Low Value Volume
0.9¢ 0.9¢ 0.8¢ $145.0K 18.00M

Buyers (Bids)

No. Vol. Price($)
4 1354453 0.8¢
 

Sellers (Offers)

Price($) Vol. No.
0.9¢ 11191281 27
View Market Depth
Last trade - 16.21pm 27/06/2025 (20 minute delay) ?
AVL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.