Because they are drilling, and refurbishing the power station. Then they will build a plant and operate there. They ignored the ICC verdict and the MoU with the ministry of Hydropower and Energy.
- Forums
- ASX - By Stock
- AVZ
- DRC ELECTION TODAY AVZ concerns
DRC ELECTION TODAY AVZ concerns, page-352
-
-
- There are more pages in this discussion • 163 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)