How deceptive is this comment from the nefarious one. ‘Before all the drama of commissioning unfolds’. HaHa, name one. The crusher circuit has already been signed off without a hitch. The TSF facility is complete and has been inspected and awaiting sign off. The filtration and drying circuit along with the screening and bagging are simple processes with no impact on flake size. That leaves the Grinding and floatation circuit which is currently undergoing the initial wet commissioning phase. Floatation cells have already been inspected and signed off. So many dramas I don’t know where to look. HaHa. So deceptive.
Add to My Watchlist
What is My Watchlist?