FBR 3.85% 5.0¢ fbr ltd

Ann: FBR successfully completes institutional placement, page-7

  1. 6,167 Posts.
    lightbulb Created with Sketch. 471
    Someone once told me to always read annoucements starting from the last page forward. So, I'm guessing, the first few HX, to truck 100?/300? Would be build in Sultanna road. Liebher long term manufacturing seems to be triggered with the site acceptance test. Note, this means the Site acceptance test is critical, for the future of FBR. Both Liebherr and CRH/JV plan hinges on this to go through.





    https://hotcopper.com.au/data/attachments/5901/5901337-4fb0ef8a64c0059361e1511f4e6c9ff9.jpg

 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.