ADO 4.55% 2.3¢ anteotech ltd

2024 - The year of ADO, page-298

  1. 8,942 Posts.
    lightbulb Created with Sketch. 1961
    Then there are 2 EVB maufacturig groups - so the scale up bit is interesting. EVB Plant requires JIT logistics. So batch runs and guaranteed rapid transport lines are required. Drums make sense, but holding storage for an 80KL plant would require MW to swing by a Clarke Rubber for some above ground pools.

    A fully-fledged commercial EVB Plant would be demand an onsite (Toll) production. So what sort of "R&D" throughput do Anteotech considered requires 80KL?
 
watchlist Created with Sketch. Add ADO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.