The December ANN said "the CDP will use the planned shutdown over Christmas/New Year to cool the reactor and allow the first solids charge to be installed in the vessel."
This is enough to say batch operations to me. A fixed amount of catalyst might have been added via the catalyst feed injector, but while the reactor was cold.The video from 2018 you mentioned I think most likely shows graphite from a storage hopper being emptied into a container, not directly out of the reactor.
If you recall the August 2023 webinar, Mark Edwards indicated there are several hoppers installed at the CDP.
- Forums
- ASX - By Stock
- HZR
- Ann: Hazer Achieves First Hydrogen and Graphite at CDP
Ann: Hazer Achieves First Hydrogen and Graphite at CDP, page-73
-
- There are more pages in this discussion • 212 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HZR (ASX) to my watchlist
|
|||||
Last
38.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $88.59M |
Open | High | Low | Value | Volume |
39.5¢ | 39.5¢ | 37.0¢ | $125.2K | 328.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 1880 | 38.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
38.5¢ | 25078 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 1880 | 0.380 |
2 | 50024 | 0.375 |
4 | 35638 | 0.370 |
3 | 8108 | 0.365 |
6 | 25168 | 0.360 |
Price($) | Vol. | No. |
---|---|---|
0.385 | 25078 | 2 |
0.390 | 44000 | 2 |
0.395 | 6600 | 1 |
0.400 | 182719 | 9 |
0.405 | 3510 | 3 |
Last trade - 15.53pm 25/06/2024 (20 minute delay) ? |
Featured News
HZR (ASX) Chart |