Some of you seem to be a little short focussed. It is a great hit and adds to the potential of the whole deposit. Within the 188 metres there are some higher grades and lower grades. The hole that has not been assayed has about 6m of massive sulphide mineralisation but the entire mineralised intersection is longer than that. This is a massive project by anyone's standards.