CKA 0.00% 8.4¢ cokal limited

Ann: Operation Update, page-21

  1. 872 Posts.
    lightbulb Created with Sketch. 312
    12th Feb. - 31mm at Muara Teweh and in highland areas
    13th Feb. Pattern of works at Pit 3 has changed significantly since new contractors started (base 1st clearer image 23 Jan)
    https://hotcopper.com.au/data/attachments/5954/5954748-cad048352bb9b5bb8861c1cb255c9282.jpg

    12th Batu Tuhup - river level has risen back to height where 800t barges from pit 3 have previously operated (compare my previous post) newer loading area partially filled (small cloud obscures part - see prior posts for comparisons: especially last gif) - unclear if 4000t barges can load at this point. No change in coal pile perimeters visible over last 7 days.
    https://hotcopper.com.au/data/attachments/5954/5954751-b9879dd4754aae52146c6abbb4655997.jpg
 
watchlist Created with Sketch. Add CKA (ASX) to my watchlist
(20min delay)
Last
8.4¢
Change
0.000(0.00%)
Mkt cap ! $90.63M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 127920 8.9¢
 

Sellers (Offers)

Price($) Vol. No.
8.3¢ 107563 3
View Market Depth
Last trade - 10.00am 17/07/2024 (20 minute delay) ?
CKA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.