No Nuclear expert used, Used cost estimate for a single high cost Small Nuclear project.
Meeting notes saying large scale Nuclear is not suitable based on biassed anti nuclear types
Only included cost of a single high cost Small Nuclear project and not cost of transmission lines and total cost of solar, Wind, pumped hydro or other items included in the Gen Cost reports
https://www.csiro.au/en/research/technology-space/energy/Energy-data-modelling/GenCost
Honestly shocked to see our CSIRO shocking failures or deliberately misinforming us.
- Forums
- Political Debate
- Chris Bowen and CSIRO miss informed us
Chris Bowen and CSIRO miss informed us
-
- There are more pages in this discussion • 45 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)