Glad someone else has read this horror story. The use of gas as a back is not a good read. We need to build 11 GW of new gas to firm the network. These will run 5% of the time. As an investment, say a 1GW gas turbine is a costly beast, how is the. owner going to get An ROI without significant standby payouts? These have been left out of the cost equation
Add to My Watchlist
What is My Watchlist?